Making Eurostar.com accessible
From September 2022 to March 2025 Phil worked with Eurostar as an Accessibility Engineer.
Read the full case study on A11y is Everything.
Timelines:
- Work started: September 2022
- Project duration: 2.5 years
- Website URL: https://www.eurostar.com/